AC was contracted by Parsons Brinkerhoff/WSP to provide the Bonneville Power Administration (BPA) with professional consulting services associated with this 42-mile transmission line rebuild project that extends from Eugene west to Florence.

As part of NEPA planning and project permitting efforts, AC staff conducted initial fieldwork and prepared documentation for the Environmental Assessment for the project including fisheries technical reports. AC staff also conducted fisheries fieldwork for culvert and fish passage assessments, documenting site and channel conditions and making recommendations for numerous bridge, culvert, and ford replacements associated with new road construction and existing road improvements.

AC provided design plan reviews for approximately 20 culverts and bridges over fish streams to facilitate ODFW and NMFS Fish Passage Engineer approvals, prepared ODFW Fish Passage Plans for Stream-Road Crossings, negotiated approval, provided specifications reviews for stream crossing plans and proposed site restoration measures at each crossing. A Biological Assessment was drafted to address potential impacts to ESA-listed species including UWR Chinook and OC Coho before finalization of a BPA-NMFS SLOPES for transmission line and access road rebuild projects. AC also prepared site restoration planting plans for approximately 20 culvert and bridge replacements.

AC provided professional consulting services associated with this 42-mile transmission line rebuild project that extends from Eugene west to Florence.

MORE CONSULTING PROJECTS

Portland District Corps of Engineers – South Jetty MCR-Major Rehabilitation Project

VIEW PROJECT

Shepherds Flat Central and Shepherds Flat South Wetland Assessment

VIEW PROJECT

BPA Albany-Eugene Transmission Line Rebuild Project

VIEW PROJECT

BPA Alvey-Fairview Rebuild Wood Pole Replacement Project

VIEW PROJECT

BPA Hills Creek-Lookout Point Transmission Line Rebuild Project

VIEW PROJECT

BPA Lane-Wendson Rebuild Wood Pole Replacement Project

VIEW PROJECT

BPA Hot Springs-Anaconda Transmission Line and Access Road Rebuild Project

VIEW PROJECT

OHSU West – Design/Build Fish Passage Improvement Bridge Project

VIEW PROJECT

K2 Environmental-Alvey-Fairview Rebuild Construction Compliance, Fish Salvage

VIEW PROJECT

Key Line Construction/K2 Environmental – Lane-Wendson Transmission Line Rebuild Construction Compliance, Fish Salvage and Site Restoration

VIEW PROJECT

Inspired by nature. Powered by pride.

MORE PROJECTS GET AHOLD OF US