Chehalis Emergency Bank Stabilization - Aquatic Contracting

Centralia, WA

Contracted by the City of Centralia on an emergency basis, Aquatic Contracting LLC worked to stabilize 200 feet of riverbank using a combination of large wood and rock. During the floods of December 2007, over 11 feet of river bank was lost, exposing two high pressure sewer pipes. Aquatic Contracting carefully placed nearly 2,000 cubic yards of large rock and incorporated a large log jam along the eroded bank. Efforts stabilized the bank and protected the sewer pipe, with the log jam directing river flow away from the bank and increasing fish habitat.

Efforts stabilized the bank and protected the sewer pipe, with the log jam directing river flow away from the bank and increasing fish habitat.

MORE RESTORATION PROJECTS

Fish Passage Bypass: Crooked River Watershed Council

VIEW PROJECT

Yelm Creek Off Channel Habitat Enhancement

VIEW PROJECT

Chehalis Emergency Bank Stabilization

VIEW PROJECT

Conyers Creek Bridge Replacement

VIEW PROJECT

Deep Creek Dam Removal

VIEW PROJECT

Fanno Creek / Greenway Park Enhancement Project

VIEW PROJECT

Calapooia River Fish Habitat Enhancement & Bank Reinforcement

VIEW PROJECT

Whipple Creek Stream Restoration Project

VIEW PROJECT

McKay Creek Fish Passage and Enhancement / Allen Creek Dam Removal

VIEW PROJECT

Quilceda Creek Culvert Replacement

VIEW PROJECT

Beaver Creek Restoration: Manchester Fuel Depot

VIEW PROJECT

Boatman Grove Restoration

VIEW PROJECT

Inspired by nature. Powered by pride.

MORE PROJECTS GET AHOLD OF US