Crane-Domeyer Restoration - Aquatic Contracting

Sauvie Island, OR

As part of Aquatic Contracting_s (AC) ongoing wetland restoration efforts on Sauvie Island we were contracted by the Columbia River Estuary Study Taskforce (CREST) to restore and enhance the Crane-Domeyer wetland complex. Located in a remote location on the Island, the project presented some logistical challenges and AC utilized both land and water-based equipment to deliver materials, equipment and fuel to the site. Restoration efforts included the excavation of nearly 40,000 cubic yards of material to restore the wetland areas to historical conditions along with the construction of several inlet and connector channels to restore hydraulic functions. Additionally, large wood was installed to improve habitat for fish and wildlife. After construction, AC completed erosion control, site stabilization, planting, and seeding of the site.

MORE RESTORATION PROJECTS

Quilceda Creek Culvert Replacement

VIEW PROJECT

Beaver Creek Restoration: Manchester Fuel Depot

VIEW PROJECT

Fish Passage Bypass: Crooked River Watershed Council

VIEW PROJECT

Yelm Creek Off Channel Habitat Enhancement

VIEW PROJECT

Chehalis Emergency Bank Stabilization

VIEW PROJECT

Conyers Creek Bridge Replacement

VIEW PROJECT

Deep Creek Dam Removal

VIEW PROJECT

Fanno Creek / Greenway Park Enhancement Project

VIEW PROJECT

Calapooia River Fish Habitat Enhancement & Bank Reinforcement

VIEW PROJECT

Whipple Creek Stream Restoration Project

VIEW PROJECT

McKay Creek Fish Passage and Enhancement / Allen Creek Dam Removal

VIEW PROJECT

Milk Creek In-Stream and Riparian Enhancement

VIEW PROJECT

Inspired by nature. Powered by pride.

MORE PROJECTS GET AHOLD OF US