Buckmire Slough Restoration - Aquatic Contracting

Vancouver, WA

AC was contracted by the Columbia River Estuary Study Taskforce (CREST) for this restoration project that included removal of two levees and undersized culverts, and then installation of an 80-foot steel bridge with cast in place concrete footings and a cast in place concrete bridge deck. The project also included slough and wetland enhancement, floodplain excavation, placement of large wood to create additional habitat, disposal and grading of excavated materials, installation of in-water isolation, erosion control measures, access road improvements, access road decommissioning, and then replanting and seeding. The project improved habitat access and water quality as part of an effort to restore Buckmire Slough and critical tidally-influenced wetlands along the Lower Columbia River.

MORE RESTORATION PROJECTS

Yelm Creek Off Channel Habitat Enhancement

VIEW PROJECT

Chehalis Emergency Bank Stabilization

VIEW PROJECT

Conyers Creek Bridge Replacement

VIEW PROJECT

Deep Creek Dam Removal

VIEW PROJECT

Fanno Creek / Greenway Park Enhancement Project

VIEW PROJECT

Calapooia River Fish Habitat Enhancement & Bank Reinforcement

VIEW PROJECT

Whipple Creek Stream Restoration Project

VIEW PROJECT

McKay Creek Fish Passage and Enhancement / Allen Creek Dam Removal

VIEW PROJECT

Quilceda Creek Culvert Replacement

VIEW PROJECT

Beaver Creek Restoration: Manchester Fuel Depot

VIEW PROJECT

Fish Passage Bypass: Crooked River Watershed Council

VIEW PROJECT

City of Prineville Wetlands Restoration

VIEW PROJECT

Inspired by nature. Powered by pride.

MORE PROJECTS GET AHOLD OF US