Fanno Creek / Greenway Park Enhancement Project - Aquatic Contracting

Beaverton, OR

Aquatic Contracting LLC constructed 2,100 feet of new stream channel and installed over 30 log jams and single log structures. The logs were placed to mimic trees falling into the channel. The project was designed and constructed to increase fish habitat and reduce flooding on Fanno Creek.
The new meandering creek channel was constructed and excavated entirely in the dry. Fanno Creek was then carefully diverted while final excavation directed the creek into the new channel. The old channel was filled and shaped into a shallow swale to allow for storm water treatment from adjacent storm drains. Log jams were pinned, roped, and/or anchored into place, and a new bridge was placed over Fanno Creek.

This project was designed and constructed to increase fish habitat and reduce flooding on Fanno Creek.

MORE RESTORATION PROJECTS

Quilceda Creek Culvert Replacement

VIEW PROJECT

Beaver Creek Restoration: Manchester Fuel Depot

VIEW PROJECT

Fish Passage Bypass: Crooked River Watershed Council

VIEW PROJECT

Yelm Creek Off Channel Habitat Enhancement

VIEW PROJECT

Chehalis Emergency Bank Stabilization

VIEW PROJECT

Conyers Creek Bridge Replacement

VIEW PROJECT

Deep Creek Dam Removal

VIEW PROJECT

Fanno Creek / Greenway Park Enhancement Project

VIEW PROJECT

Calapooia River Fish Habitat Enhancement & Bank Reinforcement

VIEW PROJECT

Whipple Creek Stream Restoration Project

VIEW PROJECT

McKay Creek Fish Passage and Enhancement / Allen Creek Dam Removal

VIEW PROJECT

Milk Creek In-Stream and Riparian Enhancement

VIEW PROJECT

Inspired by nature. Powered by pride.

MORE PROJECTS GET AHOLD OF US