AC was contracted by the FCA to install a large horizontal fish screen and a vertical fish ladder to eliminate fish entrapment, improve fish passage, and assist the Badger Creek Improvement District with their conservation goals. Located within the Badger Creek Wilderness, construction access was extremely limited, and the project site was miles from the nearest road. All materials and equipment were mobilized 3 miles up the district’s narrow irrigation ditch to the proposed screen location. AC installed the large, modular, prefabricated steel fish ladder in segments, making modifications to the concrete headgate for the specified fishway entrance and exit. AC then installed the dual 80-foot long horizontal fish screen in segments behind the concrete headgate. FCA’s screen is designed to be self-cleaning and is pre-fabricated, allowing for both ease of installation and minimal maintenance.

MORE RESTORATION PROJECTS

Fish Passage Bypass: Crooked River Watershed Council

VIEW PROJECT

Yelm Creek Off Channel Habitat Enhancement

VIEW PROJECT

Chehalis Emergency Bank Stabilization

VIEW PROJECT

Conyers Creek Bridge Replacement

VIEW PROJECT

Deep Creek Dam Removal

VIEW PROJECT

Fanno Creek / Greenway Park Enhancement Project

VIEW PROJECT

Calapooia River Fish Habitat Enhancement & Bank Reinforcement

VIEW PROJECT

Whipple Creek Stream Restoration Project

VIEW PROJECT

McKay Creek Fish Passage and Enhancement / Allen Creek Dam Removal

VIEW PROJECT

Quilceda Creek Culvert Replacement

VIEW PROJECT

Beaver Creek Restoration: Manchester Fuel Depot

VIEW PROJECT

River Island North Restoration

VIEW PROJECT

Inspired by nature. Powered by pride.

MORE PROJECTS GET AHOLD OF US