The Meacham Creek Restoration Project was a large scale restoration project east of Pendleton, Oregon. The project was the re-channelization of nearly 2 miles of Meacham Creek into its historic channel. AC was subcontracted by Tapani Underground Inc. to assist with turbidity and erosion control, water diversion, and install all habitat features including rock and log jams, boulder clusters and stabilization structures. The project included the construction of over 40 large log jams, 1000 single and double log structures and placement of more than 3000 boulders.