Happy Creek Culvert Replacement and Restoration - Aquatic Contracting

Oxbow Park, OR

As part of an ongoing restoration effort in the Sandy River Basin, Aquatic Contracting was hired to implement the multi-faceted Happy Creek Restoration Project. AC began by excavating and enhancing a 1600 foot long side channel to the Sandy River, installing over 400 logs to create numerous in-stream habitat structures. Part of side channel excavation included installation of a 325 foot long inlet log jam structure to help direct flow from high water events into the side channel. A perennial tributary to the Sandy River was also restored and redirected through its historic floodplain, into the newly excavated side channel, and then to the Sandy River. AC installed a new fish passable culvert under the Park’s main access road and re-built and paved the road to highway standards. AC excavated pools, installed single and multiple log structures as in-stream habitat and installed a small pedestrian trail bridge for public access. As part of the project, AC biologists also conducted fish salvage and regulatory agency coordination.

MORE RESTORATION PROJECTS

Deep Creek Dam Removal

VIEW PROJECT

Fanno Creek / Greenway Park Enhancement Project

VIEW PROJECT

Calapooia River Fish Habitat Enhancement & Bank Reinforcement

VIEW PROJECT

Whipple Creek Stream Restoration Project

VIEW PROJECT

McKay Creek Fish Passage and Enhancement / Allen Creek Dam Removal

VIEW PROJECT

Quilceda Creek Culvert Replacement

VIEW PROJECT

Beaver Creek Restoration: Manchester Fuel Depot

VIEW PROJECT

Fish Passage Bypass: Crooked River Watershed Council

VIEW PROJECT

Yelm Creek Off Channel Habitat Enhancement

VIEW PROJECT

Chehalis Emergency Bank Stabilization

VIEW PROJECT

Conyers Creek Bridge Replacement

VIEW PROJECT

Horsetail Creek Restoration

VIEW PROJECT

Inspired by nature. Powered by pride.

MORE PROJECTS GET AHOLD OF US